References

        2019​

  • Execution of Akare Biomass Power Plant Boiler Performance Test Acc. to DIN 1942. 3rd Party Reporting Services with Bureu Veritas  

  • Execution of Varaka Paper Factory Power Plant Boiler Performance Test Acc. to ASME PTC 4.1. 3rd Party Reporting Services with Bureu Veritas

  • Execution of Varaka Paper Factory Power Plant FGD plant Performance Test. 3rd Party Reporting Services with Bureu Veritas

  • Execution of Global Holding Mavi Bayrak Biomass Power Plant - Mardin Boiler Performance Test Acc. to DIN 1942. 3rd Party Reporting Services with Bureu Veritas

  • Giving Consultancy and Site Engineering Service to Marzinc with Bureu Veritas.

  • Giving Site Engineering Service to Ankara Kazan Soda Electric Generation Plant with Bureu Veritas. 

  • Manufacturing of 4 x 200 t/h Pugmill (Double Shaft Paddle Mixer) Manufacturing for 2x160 MW 18 Mart Çan Power Plant

        2012 - 2018

  • Preparation of Feasibility Report for 3x150 MWe Coal Fired Thermal Power Plant to Soma Holding Gürmin Enerji

  • Giving Consultancy Services for 3*150 MW Coal Power Plants to Soma Holding Gürmin Enerji

  • Preparation of Feasibility for 2x150 MWe Coal Fired Thermal Power Plant  to Adana Organize Bbölgesi

  • Preparation of Feasibility Report for 1x285 t/h Kırka Coal Fired Thermal Power Plant for Eti Maden Genel Müdürlüğü

  • Preparation of Feasibility Report for 1x180 t/h Emet Coal Fired Thermal Power Plant for Eti Maden Genel Müdürlüğü

  • Investigation about second hand power plant and preparation about statues report for Coal Power Plants in Germany and Austria,

  • Due Diligence report for existing Wet Flue Gas Desulphurization plant and modernization projects, rehabilitations

  • Giving Translation and Training Service for Tufanbeyli TPP

  • Giving Consultancy Services to Bio Mass Power Plants to Global Holding

  • Execution of Ash Handling Project for 2x150 MW Khabat Thermal power Plant.

  • Execution of Ash Handling Project for 5x620 MW Yanbu Desalination Plant.

  • Execution of Ash Handling Project for 2x135 MW Bolu Göynük Thermal Power Plant

  • Execution of Ash Handling Project for 3x150 MW Tufanbeyli Thermal power Plant.